Nanospace semiconductor facility in Singapore
Featured project
Nanospace, Singapore
For semiconductor facilities

Tool-install design.
Project delivery.

We engineer the utility connections your production tools need, produce installation packages and manage the work from planning to handover.

Our role at Nanospace

Tool-install design · Utility routing · Layout planning · Tender documentation

View project details
What we do

Engineering services for
semiconductor tool installations.

We support fab owners, equipment manufacturers and tool-install contractors.

Engineering & documentation

Tool Install Design

Design the utility connections that semiconductor equipment needs to operate.

Power, water, gas and exhaust routing. Installation drawings, point-of-connection assignments and technical specifications.

See related work
Planning & delivery

Program & Project Management

Plan and coordinate the installation from early requirements to handover.

Installation schedules, contractor coordination, progress tracking and communication between owners, OEMs and site teams.

See related work
People & capability

Training & Industry Development

Prepare contractors and fab teams for tool-install work.

Drawing interpretation, OEM requirements, construction sequencing, cleanroom practices and site coordination.

Discuss your requirements
Methods & innovation

Research & Development

Explore better ways to design and deliver tool installations.

Installation methods, engineering workflows and industry partnerships focused on constructability and responsible resource use.

Discuss your requirements
Our work

Projects &
consultancy engagements.

See the scope of our engineering and project-delivery work.

Nanospace facility in Tampines, Singapore, where CornerStone delivered tool-install design
Nanospace, Tampines, Singapore
Completed project Singapore

Tool-install design
for an OEM.

At Nanospace, we prepared a coordinated installation design and tender package, aligning a production tool with the existing facility systems.

What we delivered

  • P&IDs and utility routing
  • Point-of-connection assignments
  • Equipment layouts and access planning
  • Tender specifications and technical documentation
DeliverableA build-ready technical package for tendering and installation.
Read the project story
Upcoming engagement China

Helping a tool-install
contractor prepare
for fab delivery.

An announced consultancy engagement supporting a contractor serving a Korean-owned semiconductor fab in China.

Planned scope

  • Installation planning and construction sequencing
  • Quality control and on-site coordination
  • Utility routing strategies and POC validation
  • Installation readiness reviews and team mentoring
FocusStrengthening the contractor’s installation planning and delivery capability.
Read the engagement announcement
How we work

From tool requirements
to installation drawings.

Review the equipment requirements, coordinate the facility interfaces and prepare a package the installation team can use.

FACILITY / TOOL INTERFACESREQUIREMENTS REVIEW
FACILITY SYSTEMS POWERWATERGASEXHAUST POINTS OF CONNECTION PRODUCTION TOOLRequirements under reviewCOORDINATED INSTALLATION DESIGN
ILLUSTRATIVE • NOT AN ENGINEERING DRAWINGCSN / TI
01 / UNDERSTAND

Start with
the requirements.

Review what the production tool needs and what the facility can provide. Identify capacity gaps, site constraints and coordination decisions before installation begins.

Tool data reviewFacility capacityGap analysis
02 / INTEGRATE

Make the
connections work.

Coordinate utility routes, points of connection and access. Bring the tool, cleanroom and sub-fab interfaces together in a design that accounts for real site conditions.

Utility routingPOC coordinationConstructability
03 / DELIVER

Prepare for
execution.

Bring drawings, technical specifications and project sequencing into a coordinated package. Support the people responsible for installation, start-up and handover.

Technical packagesProject coordinationInstallation readiness
The people behind the work

Semiconductor experience.
Engineering leadership.

Leadership grounded in semiconductor facility development, environmental engineering and the realities of project delivery.

Precision with purposeSafety in designIntegrity in partnership

Derick Ngui

Director

Over 25 years in semiconductor facility development, specialising in tool-install design, construction and qualification across global wafer-fab projects.

Dr Patricia Lee

Director of Operation & R&D

A PhD in environmental engineering, with experience in wastewater and ultrapure water systems, doctoral research and industry-focused research projects in Singapore.

Let’s start a conversation

Planning a semiconductor
tool installation?

Tell us about your facility, your tool-install requirements or the challenge your team is working through.

info@cornerstonenex.com

Singapore
+65 9048 7990
Block 899C Woodlands Drive 50
#02-298, Singapore 732899

Penang, Malaysia
+60 14 710 9952
IG-21-3A, Lorong Sri Tanjong Pinang
Tanjong Tokong, Penang 10470

Please share a brief overview. Confidential drawings and technical files can be discussed directly with our team.

Design preview — this form does not send or store enquiries.